I will check, last time I heard anything is was in the engineering and design phase. I do know the permits have been applied for, not sure if they have been issued.
We should be getting close to going out to bid for construction.
BTW, the rebuild is being funded by DWH-NRDA Recreational Use/Public Access funds.Carl
Life is too short to drink bad beer.
Disclaimer: This post and/or report is not a substantiation of or reflection on the true accuracy of the present stock assessment methods. It is only an anecdotal report on or comment concerning local observations. Your results may vary.
-
The Following User Says Thank You to CarlF For This Useful Post:
-
09-16-2018, 06:37 PM #12
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,512 Times in 3,994 Posts
- Blog Entries
- 6
I suspect more 'money' will begin to become available for projects after Oct 1st...
-
09-16-2018, 06:59 PM #13
- Join Date
- Feb 2013
- Location
- birmingham, al
- Posts
- 274
- Thanks
- 327
- Thanked 54 Times in 34 Posts
ahhhh...makes sense...the “fish”cal year!
-
09-17-2018, 10:00 AM #14
- Join Date
- Oct 2011
- Location
- Mobile, AL
- Posts
- 3,635
- Thanks
- 321
- Thanked 1,633 Times in 827 Posts
Nope, the flow of DWH-NRDA funds is not constrained by fiscal year turnover.
Carl
Life is too short to drink bad beer.
Disclaimer: This post and/or report is not a substantiation of or reflection on the true accuracy of the present stock assessment methods. It is only an anecdotal report on or comment concerning local observations. Your results may vary.
-
The Following User Says Thank You to CarlF For This Useful Post:
-
09-17-2018, 09:38 PM #15
- Join Date
- Mar 2013
- Posts
- 5
- Thanks
- 1
- Thanked 2 Times in 2 Posts
Thanks for the info fellas!
-
09-19-2018, 02:43 PM #16
- Join Date
- Apr 2015
- Location
- gulf shores
- Posts
- 120
- Thanks
- 107
- Thanked 118 Times in 53 Posts
This is being paid with Federal funds. There was a plan to start on it after the ramp was finished. I was told that by Director Bannon in the early spring. Obviously, It is not on track to proceed as planned. Be patient...blueprints can change, bids have to be redone, etc, Lots of reasons things could be delayed.
FYI...after working for the state for 25 years I can't recall any projects that got done ahead of time LOL! It would be beneficial for them to wait til December to start so that the bull red folks in boats would have full acess during prime time I think.
-
The Following User Says Thank You to JayHook For This Useful Post:
-
09-19-2018, 04:12 PM #17
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,512 Times in 3,994 Posts
- Blog Entries
- 6
LOL You're singin to the choir Jay.
Remember this is the same group that had to wait almost 5 years while 'our' pier was rebuilt ;-)
-
The Following User Says Thank You to Pier#r For This Useful Post:
Well, after several hours making phone calls, I was able to track down a certain manufacturer’s service center in California. Thankfully, they agreed to send out my needed parts. These were left over...
You would think I would know this!