Pavilion Reef Work
Be on the lookout for more nearshore reef work being conducted Saturday! Work will be conducted at the Gulf State Park Pavillion circalittoral reef site. The contractor will be using a crane barge with spuds to install the reefs (i.e. a jack up rig will not be used during installation). Work is set to begin Saturday around noon and complete the installation on Monday if weather remains calm.
-
11-18-2018, 08:54 AM #2
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,512 Times in 3,994 Posts
- Blog Entries
- 6
The Reefmaker is on site just outside the sandbar from the Pavilion early this Sunday morning...
Photo by Milton Rittelmeyer
-
11-18-2018, 08:58 AM #3
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,512 Times in 3,994 Posts
- Blog Entries
- 6
Another view, this one by Steve Jones...
Well, after several hours making phone calls, I was able to track down a certain manufacturer’s service center in California. Thankfully, they agreed to send out my needed parts. These were left over...
You would think I would know this!