-
04-26-2022, 08:12 AM #1
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
Rumors
Anybody heard anything lately on what they are doing with the Pier?
-
04-26-2022, 01:10 PM #2
- Join Date
- Oct 2011
- Posts
- 267
- Thanks
- 390
- Thanked 266 Times in 87 Posts
I've heard they're doing nothing.
-
04-26-2022, 04:32 PM #3
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,511 Times in 3,993 Posts
- Blog Entries
- 6
... until the fall :-(
BOO!
-
04-26-2022, 04:41 PM #4
- Join Date
- Oct 2011
- Location
- 800 Miles north
- Posts
- 1,489
- Thanks
- 2,763
- Thanked 232 Times in 180 Posts
-
04-26-2022, 07:53 PM #5
- Join Date
- Oct 2011
- Posts
- 267
- Thanks
- 390
- Thanked 266 Times in 87 Posts
-
04-26-2022, 08:54 PM #6
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,511 Times in 3,993 Posts
- Blog Entries
- 6
ay there's the rub: Earlier statements (made to me by folks 'in the loop') to the effect assuring the balance of the pier will remain open during repairs (at least to the middle platform), are now being mulled over and may be nulled.
That revelation does not make me happy :-(
-
04-26-2022, 10:09 PM #7
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
I just wish somebody would let us now if and when repairs are to start. Has a contract been bid sure hope so. Is any work being done to get started on poring of the pillars.
-
04-27-2022, 04:44 AM #8
- Join Date
- Apr 2013
- Location
- Foley, AL
- Posts
- 1,600
- Thanks
- 1,200
- Thanked 1,821 Times in 514 Posts
One problem with the long span is that the pier bents must be able to bear the load (there are 4 gone, and more may be compromised, so at least 2X or 3X design load to span 200 feet). This means that probably one could only support a narrow walkway to the octi that might not support traffic like the golf carts, a lot of people at once, or the equipment and materials needed to repair the octi. This would have to be some sort of custom design/build overhead truss.
While most of us fishermen, including me, would be happy with such a narrow walkway, the state may not be willing to do it.People are shocked to see sharks in the water around here.
If you see natural water taste it. If it's salty it has sharks in it. If it's fresh it has alligators in it. If it's brackish it has both.
-
The Following User Says Thank You to frednic For This Useful Post:
-
04-27-2022, 08:14 AM #9
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,511 Times in 3,993 Posts
- Blog Entries
- 6
A similar type of breach occurred at the Okaloosa Island pier in Fort Walton Beach about 30 years ago. But there was only one bent knocked down then and two spans bridged (about 70 feet). The GSPPier gap is nearly 3 times that distance...
Interesting reading @ https://floridadep.gov/sites/default...ce-Part1_0.pdfLast edited by Pier#r; 04-27-2022 at 08:34 AM.
-
-
04-27-2022, 10:26 AM #10
- Join Date
- Oct 2011
- Location
- 800 Miles north
- Posts
- 1,489
- Thanks
- 2,763
- Thanked 232 Times in 180 Posts
True that. The only sensible route to construction site is out the existing pier. The only place for setup is the parking lot. In a clash between my cart and forklift, I give way.
Still, if they wait until after hurricane season to start, they won't see their work tossed overboard again before they are even done. And until they start, we fish.
Once access is restored, let's just hope the months of isolation from humans have not turned the island into a nesting box for endangered sea birds which cannot be disturbed.
I’ll be sliding into town March 10-14. Can you have it warm and sunny for me then? And also, how about having the fish biting??? :D
2025 5pm PIER CLOSURES