Thread: Pier Repairs
-
11-04-2021, 05:00 PM #1
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
Pier Repairs
Dreamed last night that somebody posted pictures of a barge by the Octi. lifting out the pilings that fell over. When I woke up I realized that was definitely a dream cause if it was real there would have been hundreds of pictures of the repairs being started.
-
The Following User Says Thank You to Robert(Tato)Piteo For This Useful Post:
-
01-18-2022, 11:42 AM #2
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
Linda and I drove over to Pensacola last Friday to Crazy Cazboys and she wanted to drive out to the Pier there. I'm hoping by the number of Cranes on barges working on the bridges there we're not waiting on them to be finished to start on the Pier at GSP.
-
01-18-2022, 02:14 PM #3
- Join Date
- Mar 2012
- Location
- Foley, Alabama
- Posts
- 1,669
- Thanks
- 702
- Thanked 3,524 Times in 571 Posts
Sorry Robert but GSSP pier hasn't got the needed permits from the Feds yet.
-
01-18-2022, 03:57 PM #4
- Join Date
- Oct 2011
- Location
- 800 Miles north
- Posts
- 1,489
- Thanks
- 2,763
- Thanked 232 Times in 180 Posts
Some dude in Brazil better get out a pocket knife and start whittling deck planks of Ipe wood is all I can say.
-
01-18-2022, 07:27 PM #5
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
-
01-18-2022, 08:49 PM #6
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,511 Times in 3,993 Posts
- Blog Entries
- 6
Most of the wood panels swept away by the hurricane were recovered an now in storage at the park.
-
01-21-2022, 06:06 PM #7
- Join Date
- Mar 2012
- Location
- Foley, Alabama
- Posts
- 1,669
- Thanks
- 702
- Thanked 3,524 Times in 571 Posts
Tato: wood is not the problem. I'm told it's the permits their waiting for from FEMA/NOAA and the Army Corps of Engineers.
-
01-21-2022, 07:38 PM #8
- Join Date
- Jul 2013
- Posts
- 318
- Thanks
- 120
- Thanked 275 Times in 107 Posts
The word is early to mid April
-
01-21-2022, 09:24 PM #9
- Join Date
- Nov 2012
- Location
- Gardendale,Ala/Gulf Shores
- Posts
- 1,564
- Thanks
- 677
- Thanked 1,966 Times in 479 Posts
Just wondering why it took almost a year and a half to get started on repairs?
-
01-22-2022, 02:53 PM #10
- Join Date
- Oct 2011
- Location
- Born, bred and someday dead in Midtown Mobile, AL
- Posts
- 10,166
- Thanks
- 7,916
- Thanked 13,511 Times in 3,993 Posts
- Blog Entries
- 6
It is a multi faceted project.
And the way 'gubment' works is, one phase cannot begin until the previous is complete.
The 'good news' is we should be over halfway there ;-)
1. All hell breaks loose
2. assessment phase
3. plan phase
4. permitting phase
5. RFPs
6. Bids let
7. Actual construction phase
8. Reopen, rinse and repeat...
-
I’ll be sliding into town March 10-14. Can you have it warm and sunny for me then? And also, how about having the fish biting??? :D
2025 5pm PIER CLOSURES